Kirjoita «from» ja «to» jotta haku toimisi.
ensimmäinen seuraava
viimeinen
ensimmäinen seuraava
viimeinen
Reitti-chat
Reitit:
aikareitit








Offline
1
2
3
4
5
6
7
8
9
0
piilottaa
splash
ERR
Kuljetusilmoitukset
aloitus - end / header / cause / effectdescription
-

Yeerongpilly station - extended closure


CONSTRUCTIONSTOP_MOVED
On Monday 18 September 2023, Yeerongpilly station closed for important Cross River rail upgrade works.

Juna DBBNBussi R591Bussi R604Juna FGBNBussi R585Bussi 104Bussi 105Juna BRBNBussi 108Bussi 19
-

Bulimba to Teneriffe Cross River Ferry - timetable changes


OTHER_CAUSEOTHER_EFFECT
From Monday 29 May 2023 until September 2024, the Bulimba to Teneriffe Cross River Ferry will have some timetable changes due to a change in vessel providing the service. Please plan your journey in advance and allow for extra travel time. Timetable changes

Aqua-bussit TNRF
-

Delays 30 mins - Beenleigh, Gold Coast, Ipswich and Springfield lines


OTHER_CAUSESIGNIFICANT_DELAYS
Beenleigh, Gold Coast, Ipswich and Springfield line trains travelling in both directions are delayed up to 30 minutes due to an earlier road vehicle striking a rail bridge at Indooroopilly.

Bussi R604Juna BRRWJuna BDVLJuna BRBNJuna CAIPJuna CARWJuna BRVLJuna CASPJuna BRIPJuna DBBNJuna BRSPJuna FGBNJuna NAIPJuna NASPJuna RPIPJuna IPRWJuna RPSPBussi R591Bussi R701Bussi R585Bussi R592Bussi R594Bussi R595Bussi R597Bussi R599
-

Lindum station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Lindum station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Lindum for the duration of the works. While the station is closed, alternative transport options will be available; includ

Bussi R604Bussi 229Juna DBCLBussi R348Bussi R585Juna SHCLJuna BRCLBussi 223
-

Buranda train station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 8 January 2024 until 2025, Buranda train station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Buranda for the duration of the works. While the station is closed, alternative transport options will be available

Bussi R604Bussi R348Juna DBCLBussi R585Juna SHCLJuna BRCL
-

Gold Coast Highway, Mermaid Waters - minor delays


CONSTRUCTIONUNKNOWN_EFFECT
From July 2023 until mid-November 2024, routes 700 and 777 may experience minor delays between Broadbeach South Station and Burleigh Heads, due to works on the Gold Coast Highway as part of the Gold Coast Light Rail Stage 3 project.Please allow extra travel time during this period.W

Bussi 700Bussi 777
-

Disruption to Gold Coast and Logan bus and train connections


CONSTRUCTIONOTHER_EFFECT
From Saturday 14 to Sunday 29 September, Beenleigh and Gold Coast line trains may arrive or depart earlier or later than scheduled due to Cross River Rail track closures.These changes will impact train and bus connections. Be sure to use the journey planner before you travel as you may nee

Bussi 704Bussi 765Bussi 545Bussi 547Bussi 552Bussi 714Bussi 560Bussi 715Bussi 716Bussi 562Bussi 563Bussi 717Bussi 718Bussi 565Bussi 566Bussi 550Bussi 554Bussi 740Bussi 553Bussi 722Bussi 743Bussi 723Bussi 745Bussi 752Bussi 725Bussi 726Bussi 757Bussi 727Bussi 728Bussi 587Bussi 729Bussi 735Bussi 739Bussi 744Bussi 746Bussi 747Bussi 748Bussi 749Bussi 750Bussi 751Bussi 710Bussi 753Bussi 564Bussi 755Bussi 721Bussi TX7Bussi 758Bussi 759Bussi 760
-

Bundamba station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 8 January 2024 until late-2024, Bundamba station will close for a major station accessibility upgrade. This means Ipswich/Rosewood line services will not stop at Bundamba for the duration of the works. While the station is closed, alternative transport options will be availab

Bussi R604Juna BRRWJuna CAIPJuna BRIPJuna CASPJuna CARWJuna NAIPJuna NASPJuna RPIPJuna IPRWBussi 501Bussi 502Bussi 503Bussi R585Bussi R592Bussi R594Bussi R595Bussi R597Bussi R599
-

Get onboard your new northern Gold Coast bus routes


OTHER_CAUSEADDITIONAL_SERVICE
From Monday 19 June, you'll have access to two new bus routes in Coomera and Pimpama: 720 - Coomera station to Pimpama City Shopping Centre 724 - Coomera station to Pimpama Sports Hub With lots of new stops, we're making it easier for you to get around your neighbourhood or connect with

Bussi 721Bussi 720Bussi 724
-

King George Square and Queen Street bus stations - stop changes


CONSTRUCTIONSTOP_MOVED
Temporary bus stop arrangements are in place at King George Square and Queen Street bus stations to enable Brisbane Metro construction works. While both stations remain open during these works, some bus services have moved from King George Square station and Queen Street bus station to other ne

Bussi 170Bussi 171Bussi 66Bussi 385Bussi 425Bussi 40Bussi P426Bussi P443Bussi 430Bussi 431Bussi 435Bussi 450Bussi 222Bussi 444Bussi 111Bussi 446Bussi 333Bussi 453Bussi 454Bussi 460Bussi 61Bussi 330Bussi 340Bussi 345Bussi P176
-

Northern Gold Coast buses - new routes and service changes


OTHER_CAUSEMODIFIED_SERVICE
From Monday 23 September, in partnership with the City of Gold Coast, we're delivering new and improved bus services in Coomera, Jacobs Well, Ormeau and Pimpama.These improvements mark the start of the third and final stage of a five-year bus services and infrastructure improvements package, jointly

Bussi 729Bussi 724Bussi 728Bussi 722
-

Mowbray Park ferry terminal upgrade


CONSTRUCTIONSTOP_MOVED
On Monday 8 April, Mowbray Park ferry terminal will close for approximately nine months for a major upgrade.Once complete, the new terminal will allow for two CityCats to dock at the same time, improving travel times. The new terminal will also have improved accessibility and covered waiting ar

Aqua-bussit UQSL
-

Burpengary station reopening


CONSTRUCTIONSTOP_MOVED
Burpengary station reopened on Monday 9 September!Replan your travel to make the most of your new station.

Bussi R604Juna BDCAJuna CABRJuna CAIPJuna CARWJuna CASPJuna CACAJuna DBCAJuna GYBRJuna NABRJuna GYSHJuna NAIPJuna NASPJuna NACABussi R603Bussi R585Bussi R600Bussi R601Bussi R605Bussi R609Bussi R612Bussi R616
-

7:15pm Bowen Hills to Ipswich train delayed up to 15 minutes


OTHER_CAUSESIGNIFICANT_DELAYS
The 7:15pm Bowen Hills to Ipswich train is delayed up to 15 minutes due to a road vehicle striking a rail bridge at Indooroopilly.

Juna CASPBussi R604Bussi R585Juna BRRWJuna NAIPJuna NASPBussi R592Bussi R594Juna IPRWBussi R595Bussi R597Bussi R599Juna RPIPJuna BRIPJuna CAIPJuna CARW
-

Morningside station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Morningside station will close for a major station accessibility upgrade. This means Cleveland line services will not stop at Morningside for the duration of the works. While the station is closed, alternative transport options will be available;

Bussi 227Bussi R604Juna DBCLBussi R348Bussi R585Bussi 235Juna SHCLJuna BRCL
-

Dutton Park station - extended closure


CONSTRUCTIONOTHER_EFFECT
Dutton Park station is now closed for important Cross River Rail upgrade works and is expected to reopen in late-2024 once works are complete.During the station closure, trains will run express through Dutton Park station in both directions. Find out more about the station upgrade works an

Juna DBBNBussi R591Bussi R604Bussi R585Juna FGBNJuna BRBN
-

Banyo station upgrade


CONSTRUCTIONSTOP_MOVED
From Monday 22 January 2024 until late-2024, Banyo station will close for a major station accessibility upgrade. This means Shorncliffe line services will not stop at Banyo for the duration of the works. While the station is closed, alternative transport options will be available; includ

Bussi 306Bussi R604Bussi R348Bussi R603Bussi R585Juna SHSHBussi R600Bussi R601Bussi R605Juna SHBRJuna SHCL
-

Major weekend track closures - impacts all lines


MAINTENANCEREDUCED_SERVICE
Track closure in briefStart: First service Saturday 28 SeptemberEnd: Last service Sunday 29 SeptemberAffected lines: Airport, Beenleigh, Caboolture, Doomben, Gold Coast, Redcliffe Peninsula, Shorncliffe and Sunshine Coast will be impacted by track closures and timetable changesCleveland, Ferny

Bussi R604Juna BDBRJuna BDVLJuna BDCAJuna BRBNJuna BRBRJuna CABRJuna CAIPJuna CARWJuna CASPJuna CACAJuna DBBNJuna DBBRJuna DBCLJuna DBCAJuna FGBNJuna GYBRJuna NABRJuna GYSHJuna NAIPJuna NASPJuna RPBRJuna RPIPJuna RPSPJuna SHBRJuna SHCLJuna NACABussi R309Bussi R348Bussi R591Bussi R585Bussi R603Bussi R701Juna RPSHJuna SHSHBussi R595Bussi R600Bussi R601Bussi R605Bussi R609Bussi R612Bussi R616Bussi R700
-

Yawalpah Road, Pimpama - permanent stop closures


OTHER_CAUSESTOP_MOVED
From Monday 23 September, the following two stops on Yawalpah Road will be permanently closed to route 722 services due to changes to the bus route:Yawalpah Road at Salzburg Road (Stop ID 316641)Yawalpah Road at Salzburg Road (Stop ID 316642)If you normally travel on route 722, please use the

-

Burleigh Heads Primary School - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Between 7pm to 6am each night from Sunday 11 August to Monday 30 September, the following stops at Burleigh Heads Primary School may be impacted due to Gold Coast Light Rail works. During this time, if you travel on routes 700, 765 or 777, please use the alternative stops show

-

Broadbeach South station - crossing and platform changes


CONSTRUCTIONOTHER_EFFECT
Works to connect the existing tram network and Gold Coast Light Rail Stage 3 (GCLR3) track extension started on Sunday 3 March at Broadbeach South station, with the installation of water barricades, fencing and other initial construction activities.At this stage there are no changes to tram times or

-

Redbank Plains Road, Bellbird Park - stop changes


CONSTRUCTIONSTOP_MOVED
Until mid-December 2024, the following stops on Redbank Plains Road will be impacted by roadworks.If you travel on route 524 or school services, please check the alternative stops shown below.

-

River Run Circuit, Ormeau Hills - permanent stop closures


OTHER_CAUSESTOP_MOVED
From Monday 23 September, the following two stops on River Run Circuit will be permanently closed to route 729 services due to changes to the bus route:River Run Circuit near Lansdowne Drive (Stop ID 319188)River Run Circuit near Lansdowne Drive (Stop ID 319189)If you normally travel on route

-

Redland Bay Road, Victoria Point - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Tuesday 23 April to September, the stop on Redland Bay Road at Magnolia Parade (near Renaissance Retirement Village) will be closed as part of the Cleveland-Redland Bay Road upgrade.During this time, if you travel on routes 250, 270, 272, 279, 280, 281, BUS:2

-

Imperial Parade, Labrador - temporary stop closure


CONSTRUCTIONSTOP_MOVED
Until Friday 25 October, the stop on Imperial Parade near Turpin Road will be closed due to construction.During this time, if you travel on route 712 or a school service, please use the alternative stop at the Labrador State School Community Hall shown below.Map legend Closed stopImperial Para

-

Noble Street, Dutton Park - temporary stop closure


MAINTENANCESTOP_MOVED
From Saturday 18 March until mid-2024, stop 13a on Noble Street near Princess Street will be closed due to the Dutton Park station upgrade. During this time, if you travel on route 104, 105, 107, 108 or 196, please use stop 14a on Noble Street near Fenton Stre

-

Helensvale Road, Helensvale - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Wednesday 4 September 2024 to Thursday 30 January 2025, the stop on Helensvale Road at Monterey Keys Drive will be closed due to roadworks.During this time, if you travel on route 718 or school services, please use the temporary stop shown below.

-

Wardoo Street and Cotlew Street, Ashmore - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 29 April until late December, the following stops will be closed due to roadworks.During this time, if you travel on routes 737, 741 and school services, please use the alternative stops shown below.

-

Loganlea Road, Meadowbrook - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 20 May until late October, the following stop on Loganlea Road near Ellerslie Road will be closed due to roadworks.During this time, if you travel on routes 560, 562, 568 or school services please use the temporary stop past University Drive shown below.

-

Lift outage: Park Road station, platform 1


MAINTENANCENone
The lift at the Quarry Street entry, platform 1 to the footbridge at Park Road station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

-

Returned to schedule - Buranda busway station


CONSTRUCTIONNO_SERVICE
Buranda busway station is returning to normal schedule after an earlier closure due to Brisbane Metro works.

-

Woolloongabba station - platform 2 access changes


CONSTRUCTIONDETOUR
From Monday 25 September 2023 until mid-2024, access to platform 2 at Woolloongabba station will change as construction of the new Cross River Rail Woolloongabba station progresses.The footpath between Woolloongabba station platform 2 and Main Street will temporarily close.Access to platform 2 will

-

First Avenue, Caloundra - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 12 August until Monday 11 November, the following First Avenue stops will be closed due to roadworks.During this time, if you travel on routes 606 or 609, please use the alternative stops shown below.

-

Adelaide Street, Brisbane City - evening stop closures


CONSTRUCTIONSTOP_MOVED
From Sunday 18 February until late 2024, all bus stops on Adelaide Street, located between George Street and Albert Street, will close between 7pm and 5am, Sunday to Thursday.During these times your bus service will move to alternative stops nearby on Adelaide Street, between Albert Street and Edwar

-

Gold Coast Highway - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Due to Gold Coast Light Rail works, several stops along the Gold Coast Highway will be temporarily closed.If you travel on routes 700, 753, 754, 757, 764, 765, 777 or school services, your journey may be impacted by these stop closures. Please see below

-

Fryar Road, Eagleby - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 2 September until mid-October, the following stops on Fryar Road will be closed due to roadworks.During this time, if you travel on route 563, 564, 568 or school services, please use the alternative stops shown below.[{"name":"Closed stop","icon":"https://translink.com.

-

King George Square station - entrance closure


CONSTRUCTIONOTHER_EFFECT
From 8pm Wednesday 30 March, station modification works for the Brisbane Metro project will start at King George Square station. Because of this, the station entrance on Adelaide Street (closest to Brisbane City Hall) will temporarily close until 2024.

-

Casey Street, Leichhardt - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 26 September to Sunday 6 October the following stops in Leichardt will be closed due to roadworks.During this time, if you travel on route 506 or school services, please use the alternative stops shown below.

-

Bermuda Street, Burleigh Waters - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Tuesday 24 September to Tuesday 8 October, the following stop on Bermuda Street at Lake Orr Drive will be closed due to roadworks.During this time, if you travel on route 734 or school services 3029 or 3410, please use the alternative stop on Southport Burleigh Road shown belo

-

Redland Bay Road, Victoria Point - temporary stop closures


CONSTRUCTIONSTOP_MOVED
Until February 2025, the following Redland Bay Road stops will be closed due to roadworks.During this time, if you travel on route 250, 272, 280, 281, 282 or school routes please use the alternative stops below.

-

Buranda busway station - weekend station closures


CONSTRUCTIONSTOP_MOVED
Due to Brisbane Metro works Buranda busway station will be closed between:9pm Friday 20 September to 5am Monday 23 September 2024,9pm Friday 27 September to 5am Monday 30 September 2024, and9pm Friday 4 October to 5am Monday 7 October 2024.During this time, if you travel on a service from one of the

-

Pacific Parade, Currumbin - temporary stop closure


CONSTRUCTIONDETOUR
From Monday 6 May until late-2024, the stop on Pacific Parade at Currumbin Beach will be closed due to Gold Coast City Council works on the seawall.During this time, if you travel on route 767, 768 or school services, please use the alternative stop on Pacific Parade nearby Murraba

-

Health Care Drive, Springfield Central - temporary stop closure


MAINTENANCESTOP_MOVED
Until November 2024, ??????the stop on Health Care Drive at Mater Private Hospital will be closed due to construction.During this time, if you travel on route 533, please use the alternative stop at UniSQ shown below.Map legend Closed stopHealth Care Dr at Mater Private Hospital (Sto

-

Coonan Street, Indooroopilly - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 17 June until early November the following stop on Coonan St near Belgrave Rd, stop 21 (Stop ID 001670) will be closed due to Indooroopilly roundabout upgrade works.During this time, if you travel on routes 105, 106, 108, 433, 445 or S799 please u

-

Lift outage - Goodna station, park 'n' ride entrance


MAINTENANCENone
The lift at the Park 'n' Ride at Goodna station is currently out of service. Technicians have been notified.If you require assistance with station access please call 13 16 17 or SMS 0428 774 636.

-

Brisbane Road, Mooloolaba - temporary stop closure


OTHER_CAUSESTOP_MOVED
From Monday 9 October 2023 until further notice, the stop on Brisbane Road at Mooloolaba Bowls Club will be closed due to issues with bus travel along Foote Street. During this time, if you travel on routes 600, 611, 615, please use the alternative stops belo

-

Jarnahill Drive, Mount Coolum - temporary stop closures


CONSTRUCTIONSTOP_MOVED
From Monday 16 September until Friday 25 October, the following stops in Mount Coolum will be closed due to roadworks.If you normally catch route 622 or a school service from here, please use the alternatives on David Low Way shown below.

-

Beenleigh line timetable changes - Fairfield to Salisbury


CONSTRUCTIONMODIFIED_SERVICE
Until mid-2025, there will be changes to some Beenleigh services in the afternoon peaks due to important Cross River Rail works.Some peak services will run express through two or more of the following stations - Fairfield, Yeronga, Moorooka and Salisbury. If you live close to a StationLink

-

Roma Street station entrance changes


CONSTRUCTIONDETOUR
From Friday 26 May 2023, access to Roma Street station will change.Access to all train platforms, busway platform 2 and the Coach Terminal will be via the new entrance, located on Roma Street about 100 metres west towards Suncorp Stadium.Access to busway platform 1 will remain in its current lo

-

Edward Street, Brisbane City - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Friday 28 June to Friday 1 November, stop 146 on Edward Street near Margaret St will be closed due to demolition works.During this time, if you travel on route 40, please use stop 96A on Alice Street shown below.

-

Brisbane Street, Beaudesert - temporary stop closure


CONSTRUCTIONSTOP_MOVED
From Monday 5 August to Monday 7 October the following stop on Brisbane Street at Eaglesfield Street (Stop ID 319498) will be closed due to roadworks.During this time, if you travel on route 540, please use the alternative stop below.

-

Lift outage: Helensvale station, platforms 1 & 2 to subway


TECHNICAL_PROBLEMNone
The lift on platforms 1 & 2 to the subway at Helensvale station is currently out of service. Please call 13 16 17 or SMS 0428 774 636 if you require assistance.Technicians have been notified.

OK